Compressed Earthen Block Production
Step Six: The Wall
The walls go up.
Using a string-line as a guide, slurry is poured on and blocks positioned with a rubber mallet with a 1/3rd overlap.
Next: Step Seven: Finished Buildings
CEB Production Steps
- Step One: Equipment Arrives
- Step Two: Soil Preparation
- Step Three: Block Machine Running
- Step Four: The Slurry
- Step Five: The Foundation
- Step Six: The Wall
- Page Seven: Finished Buildings
- Page Eight: An industrial building in Durban
- Page Nine: Durban Demonstration House
In The Media:
- Presentation to Nigerian Architectural Conference in Abuja, Sep 2011 (pdf)
- Video: Block Production
- South African Newspaper Article, June 2010 (pdf)
- Cape Town & Durban Presentation, May 2010 (pdf)
